Awaab’s Law Phase 2: how to record excess cold and damp
If a tenant reports a cold or damp home, record when the landlord first learned of it, check whether anyone is at immediate risk and arrange the investigation. In England, Phase 2 of Awaab’s Law brings significant excess cold hazards in social housing into scope on 30 November 2026. Significant damp and mould and emergency hazards were already covered under Phase 1. Start the response straight away. A 28-day diary is optional.
Download the blank 28-day log (PDF)Print it or fill it in on your device. Your entries stay on your copy.
Put the statutory deadlines on the repair record
For a potential significant hazard, investigate within 10 working days of becoming aware of it. Normally give the tenant a written summary within three working days of concluding the investigation. Where a significant hazard is found, make it safe within five working days of concluding the investigation. A potential emergency needs investigation and, if confirmed, safety work within 24 hours of awareness. If the home cannot be made safe in time, arrange suitable alternative accommodation at the landlord’s expense.
Keep readings and inspection findings together
Give each affected room a reference. Date the resident’s account, visible staining, leaks and repairs, and note where and when each temperature or humidity reading was taken. A cold bridge is a part of the building that loses heat faster than the surrounding material. Compare a suspected cold patch with a nearby surface during inspection. Room readings alone cannot establish the condition of the wall, how the household used the heating or who caused the damp.
Record a missed visit and offer another appointment
Write down the appointment offered, how notice was given, when the officer attended and what happened. “No answer at 10:15” records an observation. Record a refusal only if the resident actually refused. Offer another suitable time, ask about access needs, and record the next contact and who owns it. A missed visit does not by itself suspend the deadlines. Keep contact details and household information in the restricted case file.
Follow the work through to completion
Record the immediate safety work, who will address the cause, the target dates and each update to the tenant. For further required preventative work, start within five working days of finishing the investigation where reasonably practicable. Otherwise take steps within those five days to start as soon as reasonably practicable and within 12 weeks. Keep the repair and inspection record alongside any room log.
Common questions
- Does the 30 November change apply to every small landlord in the UK?
- These regulations cover qualifying social housing in England. They do not impose this Phase 2 timetable on every private landlord or across all UK nations. Private landlords should check the repair and housing duties that apply to their property.
- Can temperature readings show the tenant caused the mould?
- A room log shows the conditions at the measuring point over time. A competent inspection can look for water entry, heating faults, poor ventilation and cold surfaces. Record the resident’s experience and investigate the building before drawing conclusions.
Equipment and records
See ProofTimeline’s damp and leak records for landlordsOfficial sources
- Social Housing (Regulation) Act 2023 · section 42
- The Hazards in Social Housing (Prescribed Requirements) (England) (Amendment) Regulations 2026, SI 2026/1195
- Government guidance for English social landlords • Phase 2 deadlines and access
- Government guidance • investigating and addressing damp and mould
Checked 21 November 2026.